Details of works carried out at Curraha church:
Allbrite was asked to quote for a full new radiator system in the church. There was a very ineffective heating system in the church. We suggested to Father Phil leaving the system alone and maybe to give it a gentle clean and save thousands of euro.
Upon the first visit to the church, after 2 hours of the heating turned on the level of heat in the church was quite poor. The oil burner was on continuous but with little effect. We made a few alterations to the plumbing works, installed a magna clean magnetic filter and flushed out the heating system.
We removed approximately one bucket of sludge from the heating system. We then turned the heating on before tidying up and the church was at 23degrees Celsius within a half an hour.